Projects - Melbourne Central



Location: Swanston St, Melbourne
Planned completion: Late 2004
Actual Completion: November 2004
Value: $226 million
Client: The Lend Lease Group
Products Used:
Solid epoxy trowel system
Water Based Epoxy
   

 

Melbourne Central   Methodology:
melb central  

Apply and install a solid epoxy trowel system blend to the mall walkways. A water based epoxy was applied as a top coat to walkway areas.
 
Melbourne Central   Job Description:
melb central  
The Melbourne Central Redevelopment was aimed at enticing consumers back to the former Daimaru precinct, with a view to attracting a diverse range of shoppers. The Melbourne Central site now contains a cinema complex, a plethora of retail stores and of course the heritage listed shot tower.
 
Select Coatings were responsible for the various sections of the Melbourne Central redevelopment mall walkway areas. The combination of solid epoxy trowel system and water based epoxy as a top coat provides the perfect combination of stability, strength and cleaning efficiency.

 